← Tillbaka till jobb

MEP Project Site Engineer

  • På plats
  • Sverige
  • Engelska
  • Publicerad 02.10.26

MEP Project Site Engineer Citylink Project Shape the future of Swedish infrastructureHOCHTIEF is one of the world's leading infrastructure and construction groups, employing approximately 38,000 people worldwide. We deliver complex projects across a wide range of sectors, including roads, bridges, tunnels, railways, airports, ports, buildings, and both conventional and renewable energy. With operations across Europe, North America, and the Asia-Pacific region, HOCHTIEF combines engineering expertise with innovative and sustainable solutions to shape the infrastructure of the future Ready to contribute to one of our Stockholm-area projects? We're offering an exciting opportunity for a MEP Project Site Engineer to grow in a dynamic, international environment at our tunnel project Citylink directly under Stockholm. Summary of Duties / ResponsibilitiesSupport the MEP Manager in coordination, execution, supervision, documentation, testing and handover of MEP works. Make sure quality, timeline, budget, and HSE goals are achieved. Key ResponsibilitiesPrepare and follow up RFIs, RFAs, NCRs and technical submittals.Prepare and track material submittals and inspection requests.Inspect delivered materials and verify compliance with approved submittals.Monitor daily MEP installation activities and subcontractor performance.Participate in site inspections and coordination meetings.Prepare daily and weekly progress reports.Verify installation readiness prior to inspections. QualificationsDegree in Electrical or Mechanical Engineering.3–5 years of construction experience.Experience with MEP installations and subcontractor coordination.Strong reporting and documentation skillsLanguages :English Fluent , Swedish is an Advantage. LocationDanderyd, Sweden About ProjectSvenska kraftnät is building a new electricity connection between Anneberg and Skanstull, in order to meet the growing demand for electricity in Stockholm. The contractor is the JV HOCHTIEF Implenia consortium.The electricity connection will run in a tunnel that extends from Danderyd in the north, under the inner city of Stockholm, to Mårtensdal, south of Skanstull. JV HOCHTIEF Implenia has been at the construction site in Danderyd since the summer of 2019. Approximately 13,475 km have been drilled so far. ApplyIf you have the qualifications, experience, and passion for creating a safe and successful construction environment, we would love to hear from you. Get in touch with Nicole Granlund [email protected],or apply directly at: https://hochtief.se/karriar/ Join HOCHTIEF and help build the infrastructure of tomorrow.More information about HOCHTIEF can be found at www.hochtief.com